PROJECTS

Home > Services > Project Management Consultancy > Makers Maxity – BKC, Mumbai

Projects

Makers Maxity

Location

BKC, Mumbai

Special features of the project

Structure is constructed for service life of 100 years.

Area

2,30,300 Sq. M.

Cost

65000 Lacs

Phase -01

Commercial Space, Mall cum Multiplex ‘Drive in Theatre’ for 320 Cars at Roof Top

Phase -02

7 Star Hotel – (Core & Shell) Housing 300 x 2 guests and 5 Restaurants & Recreation Complex & Related Services.

DRIVE IN THEATRE & RETAIL MALL

Total Concrete Consumed = 58,000 Cu. M.
High Performance Concrete = 18000 Cu. M.
Normal Concrete = 480,0000,000 Cu. M.

HOTEL BUILDING

Total Concrete Consumed = Cu. M.
High Performance Concrete = 15000 Cu. M.
Normal Concrete = 65,000 Cu. M.

High Performance Concrete conforming to following Durability Test

1) RCPT (Rapid Chloride Penetration Test) ASTM C1202: Acceptance limit = 1000 coulomb
2) ISAT (Initial Surface Absorption Test) BS 1881 Part 208:1996 Acceptance limit = 0.2ml/m2/sec
3) Water Permeability Tests DIN 1048 Acceptance limit = 8mm
4) Minute Absorption Test BS 1881 Part 122 Acceptance limit = 2.0% at 28 days
5) Drying Shrinkage Test IS:1199 Acceptance limit = 0.05% 6) Wetting Expansion Test IS:1199 Acceptance limit = 0.03%